Skip to main content
Interiors vocabulary varies by studio and by country. This is what these words mean in Atelier, which is not always what they mean in your office.

Structure

Studio — Your workspace. Holds your branding, currency, tax settings, team and everything below. One studio per subscription. Client — The entity you invoice. Can have several contacts and several projects. Contact — A named person on a client or vendor record, with their own email, phone and role. Project — One job for one client. Holds phases, tasks, pinboards, schedules and files. Phase — A stage of a project with a start date, end date and colour. Phases draw the timeline on the project Overview. Vendor — Anyone you buy from: manufacturer, showroom, dealer, workroom, fabricator, freight company.

Specifying

Product library — The studio-wide catalogue of every product you have specified. Shared across all projects. Product — A single item in the library, with brand, category, dimensions, retail price, vendor and images. Pinboard — A shareable canvas of images, plans, materials and product shots. Can hold several pages. Pin — One item on a pinboard. A pin linked to a library product carries that product’s real price, brand and vendor. FF&E — Furniture, Fixtures and Equipment. The standard industry term for everything specified into a space that is not the building itself. Schedule — The FF&E list for a project: what goes in, how many, what it costs, and where it is in procurement. Three views — Planning, Financials, Procurement.

Money

Retail price — The public price of a product, held in the library. Reference only. Vendor cost — What the vendor charges you on this job. Trade price. Margin is calculated from this, never from retail. Markup — Your uplift on the vendor cost, as a percentage. Set per item on a schedule, where the column is Markup %. The same number reaches the client under a different name: see Procurement fee. Procurement fee — What your markup is called on an invoice. It is not a second charge and not a different number — it is the schedule’s Markup %, wearing the wording your studio chose in Settings → Studio → Procurement fee label. Building an invoice from a schedule shows it against each row as 35% procurement fee, so a studio that renamed it to Design Management will read that instead. Rename it there rather than editing invoices one by one. Selling price — Vendor cost plus markup, per unit. What the client pays for one. Client total — Selling price × quantity. The invoice line. Budget — The total the client has agreed, set on the project. Shown against spend on the schedule’s Financials view.

Documents

Proposal — What you send before the work is agreed. Invoice — A bill to the client. Usually created from a schedule, so line items, markup and tax carry across. Change order — A documented, priced change to agreed scope. The record of what the client signed up to after the original proposal. Purchase order (PO) — What you send a vendor to place an order. Carries your studio details and the project’s ship-to address.

Procurement

Lead time — How long a piece takes to arrive, in the vendor’s own words. Free text, because vendors quote it in incompatible ways. Est. ship — An actual date the vendor expects to ship, on the Procurement view. Unlike lead time, this is a date. Status — Where a schedule item is in the flow, from Pending to Paid. Ready to order — Items the client has approved that nobody has ordered yet. Counted on the project Overview. Reuse — no purchase — A status for the client’s existing furniture that stays in the scheme. Appears in the specification, costs nothing, never reaches procurement. To be sourced — A status for a piece you know is needed but have not found yet. Holds its place on the schedule and in the budget.

Working

Inbox — Your notification feed: task activity involving you (assigned, replied to, reacted to), plus every comment and approval from shared pinboards. Shared schedules don’t notify — they’re read-only for the client. My tasks — Everything assigned to you, across all projects. Today — Your private notepad for the day. Nothing arrives in it automatically; nobody else can see it. Pinned — Schedules and pinboards you have pinned to the sidebar.